1. Is the bracing adequate
2. Are the cut-outs/embedded items positioned in marked places
3. Is formwork vertical
4. Is the horizontal alignment correct
5. Whether sealing of joints/holes done properly to avoid grout loss
6. Are the faces of plywood free from adhering grout, projecting nails, splits etc
2. Are the cut-outs/embedded items positioned in marked places
3. Is formwork vertical
4. Is the horizontal alignment correct
5. Whether sealing of joints/holes done properly to avoid grout loss
6. Are the faces of plywood free from adhering grout, projecting nails, splits etc
7. Is the check for supports and jacks been made and found ok
8. Has mould oil been applied evenly & thoroughly
9. Is access adequate
10. Are the approved shop drawings available at site
11. Whether provision & level/location of sleeves /ducts are checked as per the approved shop drawings and found correct
12. Whether proper protection for the sleeves/ducts provided
13. Inspection after de-shuttering
8. Has mould oil been applied evenly & thoroughly
9. Is access adequate
10. Are the approved shop drawings available at site
11. Whether provision & level/location of sleeves /ducts are checked as per the approved shop drawings and found correct
12. Whether proper protection for the sleeves/ducts provided
13. Inspection after de-shuttering